Files
picpeak/RELEASING.md
T
2026-09-08 08:32:54 +02:00

114 lines
11 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Release Process
This document describes how PicPeak releases are cut. It's the maintainer's reference, not user documentation — for the user-facing channel choice (stable vs pre-release) see the [Release Channels section in README.md](README.md#-release-channels).
## TL;DR
- **`main` branch** receives all merged work (active development). Every push triggers a `release-please` PR that proposes the next `vX.Y.Z-beta.N` pre-release. Merging that PR tags the pre-release and publishes Docker images under the `:main` rolling tag + the version-specific tag.
- **`stable` branch** holds the curated stable channel. Stable releases are cut from a known-good `main` point via a `release/X.Y.Z-merge-from-main` branch and a manual PR to `stable`. Merging that PR triggers `release-please` to propose the stable release.
- Target cadence: **a stable release every 46 weeks**, or sooner if `main` has been quiet and ready for promotion.
> **Branch model background** — `main` (active dev) was previously called `beta`, and `stable` (curated channel) was previously called `main`. The rename happened with #669 to match the convention every other open-source project uses. The mechanics below all reference the post-rename names.
## Cadence target
46 weeks between stable releases is the working target. Reasoning:
- Long enough that each stable carries meaningful changes worth the upgrade burden.
- Short enough that pre-release users aren't carrying the "real" project alone for months — the stable channel should actually be usable as the recommended channel for new installs.
- Aligns with how release-please surfaces pre-releases (multiple pre-release points usually accumulate inside a 46 week window, which gives natural promotion candidates).
This is a target, not a hard rule. Cut sooner if `main` has been quiet and stable longer than usual. Cut later if `main` is in flux for security or migration reasons.
## Promotion criteria
A `main` tip is eligible for promotion to `stable` when **all** of the following hold:
1. **CI green on the candidate `main` tip.** Specifically: `schema-drift` (`upgrade-from-bootstrap`), `fresh-install`, `Tests` (backend Jest + frontend Vitest), the four `Build and Push Docker Images` arch matrices, and `GitGuardian Security Checks`.
2. **No open `bug`-labelled issues against the candidate for at least 7 days.** Issues fixed-but-not-yet-closed count as fixed; verify their PR is in the candidate `main` tip before closing them out.
3. **An upgrade walk has been done on real production-shaped data** — apply the candidate's migration chain to a snapshot of the previous stable's DB and verify no manual intervention is required. CI proves fresh-install works; the upgrade walk is what proves the upgrade path works.
4. **Operator-time smoke** on the candidate: log in, create event, upload photos, share gallery, open as a customer, log out. Catches binary-incompatibility regressions and UI-level breaks that unit tests don't see.
If any of the four fail, the promotion waits. File any blockers as `bug`-labelled issues and let them bake on `main` before re-evaluating.
## How a stable release is cut
The actual mechanics, in order:
1. **Pick the `main` tip.** Confirm it satisfies the four promotion criteria above. Note the exact SHA — that's what you're promoting.
2. **Create the release branch from the `main` tip.**
```bash
git push origin <main-tip-sha>:refs/heads/release/X.Y.Z-merge-from-main
```
Naming convention: `release/X.Y.Z-merge-from-main`, where `X.Y.Z` is the stable version you intend to land. release-please will write the actual `X.Y.Z` on merge — the branch name is just a human label.
3. **Open a PR to `stable`.** Title: `chore(release): promote main → stable as vX.Y.Z`. Body should summarise the major themes since the previous stable, the migration count, and any operator notes (e.g. "this release adds 22 migrations; existing installs should snapshot before upgrading"). See PR #568 as a worked example (predates the rename; the mechanics are unchanged).
4. **Resolve conflicts.** `stable` almost always has commits `main` doesn't (security backports, release-please's stable-channel release commits, README rewrites). For each conflicting file, decide deliberately:
- **`backend/package.json` / `package-lock.json` + `frontend/package.json` / `package-lock.json`** — usually take `main`'s version (superset), but verify any security-pinned deps (`axios`, `nodemailer`, `i18next-http-backend`, `multer`, `tar`) on `main` are `>=` the pinned versions on `stable`. If `stable` has a newer pinned version (e.g. an emergency CVE backport `main` hasn't picked up), take `stable`'s pin.
- **`README.md`** — keep `stable`'s version if it has had a recent rewrite that `main` didn't pick up; otherwise take `main`'s.
- **`CHANGELOG.md`** — keep `stable`'s; release-please regenerates entries on its next stable cut from the commits going forward.
- **`.release-please-manifest.json`** — keep `stable`'s; release-please owns this file.
- Any other auto-merged file — spot-check that the auto-merge produced something sensible, especially for security-sensitive files (`backend/src/middleware/`, `backend/src/utils/tokenUtils.js`).
5. **Pin the stable version to match `main` (number alignment — see Versioning).** Determine `X.Y.Z` = the `main` tip's **base** version (its `vX.Y.Z-beta.N`, dropping the `-beta.N` suffix), and add an empty commit on the release branch:
```bash
git commit --allow-empty -m "chore: release X.Y.Z" -m "Release-As: X.Y.Z"
```
The `Release-As:` footer forces release-please to cut exactly `X.Y.Z`. Without it, release-please computes the next MINOR from the *previous stable* tag (e.g. `3.45.0` → `3.46.0`) while `main` is already at `3.84.x`, so the stable number drifts ever further behind for the same code.
6. **Wait for CI on the PR.** All ten checks (the original eight plus `merge-backend` and `merge-frontend`) must be green. If anything fails, fix on the release branch (NOT on `main` — `main` has already moved on).
7. **Merge.** Standard merge commit, not squash — the PR's history (the individual feature commits) carries forward into `stable`'s log.
8. **release-please picks it up.** Within minutes, release-please will open a new `chore(stable): release X.Y.Z` PR proposing the stable release. Review the auto-generated CHANGELOG.md entries for accuracy, edit if needed, and merge. That merge creates the `vX.Y.Z` git tag, publishes Docker images on the `:stable` and `:latest` tags, and creates the GitHub Release page.
9. **Close the loop.** Bulk-close any `bug` issues that were fixed-but-not-closed and now appear in the released changelog. Reference the merge commit so reporters know which version contains the fix.
## Hotfix path (backport to current stable)
Regular bug fixes are generally backported automatically from `main` to `stable`. Keep backports focused on the fix, without unrelated features, and resolve conflicts manually when needed.
**Security fixes are always released on both `stable` and `main`.** Do not wait for a full promotion to deliver a security update. A fix first applied to `stable` must also be forward-ported to `main`; a fix first applied to `main` must also reach `stable`. See [SECURITY.md](SECURITY.md) for the support policy.
When a backport needs manual handling:
1. Create a `security/cve-backport-X.Y.Z` or `fix/critical-X.Y.Z` branch off `stable`.
2. Cherry-pick or hand-write the minimal fix.
3. Open a PR to `stable` with the smallest possible diff.
4. After merge, release-please will propose a patch-level stable release (e.g. `v3.55.1`).
5. **Forward-port the fix to `main`** if it isn't already there. Otherwise the next full promotion will reintroduce the bug.
6. For security fixes, verify that the fix has been published through **both** release channels; merging the code is only part of delivery.
PR #412 ("backport 18 dependency CVE patches from beta") is a worked example of this path (predates the rename; the mechanics are unchanged).
## Versioning
PicPeak follows [Semantic Versioning](https://semver.org/) with one project-specific convention:
- **MAJOR** bumps are reserved for breaking schema changes that require operator action on upgrade (e.g. a migration that's not safe to auto-apply, an env-var rename that can't be auto-detected).
- **MINOR** bumps for new features, additive schema changes, and any change to the public HTTP API surface.
- **PATCH** bumps for bug fixes and operator-invisible internal changes.
- **Pre-release suffix** (`-beta.N`) for every `main`-channel cut; the `N` counter resets on each new MINOR or MAJOR target. The suffix kept the historical `-beta` literal even after the branch rename — operators were already pinning to `v3.x.y-beta.N` and changing the literal would have broken those pins.
release-please derives all of this from conventional commit prefixes (`feat:`, `fix:`, `BREAKING CHANGE:`, etc.) automatically.
### Stable ↔ pre-release number alignment
The two channels run **independent** release-please counters: `main` bumps on every merge (racing ahead), while `stable` only bumps on a promotion. Left to itself, `stable` computes each promotion as the next MINOR from the *previous stable tag*, so the two drift far apart — e.g. `main` at `v3.83.x-beta.0` while `stable` sat at `v3.45.0` for the **same code**, which reads as "stable is 38 versions behind" when it isn't.
To keep the numbers legible, **a promotion sets the stable version to the current `main` base version** (the `X.Y.Z` of the `main` tip's `vX.Y.Z-beta.N`, minus the suffix). Promoting a `main` at `v3.84.2-beta.0` therefore cuts stable `v3.84.2`, and the stable number tracks `main` instead of lagging. This is forced with the `Release-As:` commit in step 5 of the cut procedure — the one-time catch-up jump (e.g. `3.45.0 → 3.84.x`) is expected and happens only on the first aligned promotion.
> **Release-engineering note (2026-07):** `release-please.yml` (the stable workflow) *must* keep `target-branch: stable`. Without it, release-please defaults to the repo's default branch (`main`), reads `main`'s stale `.release-please-manifest.json`, and cuts a wrong/regressed version — this is what produced a bogus `v2.7.0` once. If a promotion ever yields an unexpected version, check that first.
## Things that don't go through this process
- **Documentation-only changes** can land on either `stable` or `main` directly (no release cut needed); release-please will pick them up on the next regular release.
- **Test-only changes** — same.
- **CI / workflow changes** — same, but be aware they take effect on the branch they land on, so a CI fix targeting `main` won't fix a broken stable-channel workflow until the next promotion.
## When this doc is wrong
If you find yourself working around something here, update the doc before doing the workaround. The point of a written process is that future-you doesn't have to remember the workaround.