After the org move + branch rename (#669): beta → main (active development) main → stable (curated release channel) This PR rewires the workflows that referenced the old branch names so release-please and the Docker build target the right channels. ## Workflow changes ### `.github/workflows/docker-build.yml` - **Push triggers**: `[main, beta]` → `[main, stable]` (both `push.branches` and `pull_request.branches`). `beta` no longer exists; `stable` is the curated channel that should also produce builds. - **`is_prerelease` detection**: pre-release context was decided by `refs/heads/beta`; now decided by `refs/heads/main` (active dev → prerelease, `-beta.N` version suffix unchanged). - **`:latest` + `:stable` tagging**: were gated on `{{is_default_branch}}` (which used to be `main` = stable channel). Default branch is now `main` = active dev, so the implicit gate would have aliased `:latest` to dev. Both tags now explicitly gate on `refs/heads/stable` OR a non-prerelease release tag. - **`:beta` tag**: REMOVED. Active-dev pulls are `:main` (auto-generated by `type=ref,event=branch`). The pre-rename `:beta` tag remains frozen at its last build under Option B / #669 — operators are expected to update to `:main` or pin to a versioned tag. ### `.github/workflows/release-please.yml` - `branches: [main]` → `branches: [stable]`. This is the **stable** release-please workflow (uses `release-please-config.json`); after the rename, the stable channel lives on the `stable` branch. ### `.github/workflows/release-please-beta.yml` - `branches: [beta]` → `branches: [main]`. - `target-branch: beta` → `target-branch: main`. - This is the **pre-release** release-please workflow (uses `release-please-config-beta.json`, `prerelease: true`); after the rename, pre-releases are cut from the new `main` (active dev). The version-suffix scheme stays `-beta.N` so existing operator pins keep working. ## RELEASING.md Rewrote the TL;DR, "How a stable release is cut", and hotfix path to reference the new branch names. Added a one-line "branch model background" note pointing at #669 so future maintainers know why `main` means active dev (the opposite of what some projects use). Filename conventions: `release/X.Y.Z-merge-from-main` (was `…-from-beta`); promotion PR title `promote main → stable as vX.Y.Z` (was `promote beta → main`). ## Why combined with PR A's content as a single PR Originally planned as two PRs (B = workflow triggers, C = release-please reconfigure). Splitting wasn't worth it: the configs are branch-agnostic (`release-please-config.json` and `release-please-config-beta.json` don't mention branch names internally), and not bundling them meant a window where the stable release-please workflow would fire on pushes to the new `main` (active dev) — exactly the wrong place. Single PR closes that gap. ## Versioning scheme — kept No version-scheme decision needed. The `-beta.N` suffix on pre-release versions is preserved (existing operator pins like `v3.71.3-beta.0` keep working). If a `v4.0.0-pre.N`-style reset is desired later, that's a separate PR with explicit operator-comms attached.
8.3 KiB
Release Process
This document describes how PicPeak releases are cut. It's the maintainer's reference, not user documentation — for the user-facing channel choice (stable vs pre-release) see the Release Channels section in README.md.
TL;DR
mainbranch receives all merged work (active development). Every push triggers arelease-pleasePR that proposes the nextvX.Y.Z-beta.Npre-release. Merging that PR tags the pre-release and publishes Docker images under the:mainrolling tag + the version-specific tag.stablebranch holds the curated stable channel. Stable releases are cut from a known-goodmainpoint via arelease/X.Y.Z-merge-from-mainbranch and a manual PR tostable. Merging that PR triggersrelease-pleaseto propose the stable release.- Target cadence: a stable release every 4–6 weeks, or sooner if
mainhas been quiet and ready for promotion.
Branch model background —
main(active dev) was previously calledbeta, andstable(curated channel) was previously calledmain. The rename happened with #669 to match the convention every other open-source project uses. The mechanics below all reference the post-rename names.
Cadence target
4–6 weeks between stable releases is the working target. Reasoning:
- Long enough that each stable carries meaningful changes worth the upgrade burden.
- Short enough that pre-release users aren't carrying the "real" project alone for months — the stable channel should actually be usable as the recommended channel for new installs.
- Aligns with how release-please surfaces pre-releases (multiple pre-release points usually accumulate inside a 4–6 week window, which gives natural promotion candidates).
This is a target, not a hard rule. Cut sooner if main has been quiet and stable longer than usual. Cut later if main is in flux for security or migration reasons.
Promotion criteria
A main tip is eligible for promotion to stable when all of the following hold:
- CI green on the candidate
maintip. Specifically:schema-drift(upgrade-from-bootstrap),fresh-install,Tests(backend Jest + frontend Vitest), the fourBuild and Push Docker Imagesarch matrices, andGitGuardian Security Checks. - No open
bug-labelled issues against the candidate for at least 7 days. Issues fixed-but-not-yet-closed count as fixed; verify their PR is in the candidatemaintip before closing them out. - An upgrade walk has been done on real production-shaped data — apply the candidate's migration chain to a snapshot of the previous stable's DB and verify no manual intervention is required. CI proves fresh-install works; the upgrade walk is what proves the upgrade path works.
- Operator-time smoke on the candidate: log in, create event, upload photos, share gallery, open as a customer, log out. Catches binary-incompatibility regressions and UI-level breaks that unit tests don't see.
If any of the four fail, the promotion waits. File any blockers as bug-labelled issues and let them bake on main before re-evaluating.
How a stable release is cut
The actual mechanics, in order:
-
Pick the
maintip. Confirm it satisfies the four promotion criteria above. Note the exact SHA — that's what you're promoting. -
Create the release branch from the
maintip.git push origin <main-tip-sha>:refs/heads/release/X.Y.Z-merge-from-mainNaming convention:
release/X.Y.Z-merge-from-main, whereX.Y.Zis the stable version you intend to land. release-please will write the actualX.Y.Zon merge — the branch name is just a human label. -
Open a PR to
stable. Title:chore(release): promote main → stable as vX.Y.Z. Body should summarise the major themes since the previous stable, the migration count, and any operator notes (e.g. "this release adds 22 migrations; existing installs should snapshot before upgrading"). See PR #568 as a worked example (predates the rename; the mechanics are unchanged). -
Resolve conflicts.
stablealmost always has commitsmaindoesn't (security backports, release-please's stable-channel release commits, README rewrites). For each conflicting file, decide deliberately:backend/package.json/package-lock.json+frontend/package.json/package-lock.json— usually takemain's version (superset), but verify any security-pinned deps (axios,nodemailer,i18next-http-backend,multer,tar) onmainare>=the pinned versions onstable. Ifstablehas a newer pinned version (e.g. an emergency CVE backportmainhasn't picked up), takestable's pin.README.md— keepstable's version if it has had a recent rewrite thatmaindidn't pick up; otherwise takemain's.CHANGELOG.md— keepstable's; release-please regenerates entries on its next stable cut from the commits going forward..release-please-manifest.json— keepstable's; release-please owns this file.- Any other auto-merged file — spot-check that the auto-merge produced something sensible, especially for security-sensitive files (
backend/src/middleware/,backend/src/utils/tokenUtils.js).
-
Wait for CI on the PR. All ten checks (the original eight plus
merge-backendandmerge-frontend) must be green. If anything fails, fix on the release branch (NOT onmain—mainhas already moved on). -
Merge. Standard merge commit, not squash — the PR's history (the individual feature commits) carries forward into
stable's log. -
release-please picks it up. Within minutes, release-please will open a new
chore(stable): release X.Y.ZPR proposing the stable release. Review the auto-generated CHANGELOG.md entries for accuracy, edit if needed, and merge. That merge creates thevX.Y.Zgit tag, publishes Docker images on the:stableand:latesttags, and creates the GitHub Release page. -
Close the loop. Bulk-close any
bugissues that were fixed-but-not-closed and now appear in the released changelog. Reference the merge commit so reporters know which version contains the fix.
Hotfix path (backport to current stable)
If a critical bug or security issue affects the current stable and main has moved too far for a full promotion to be appropriate, backport just the fix:
- Create a
security/cve-backport-X.Y.Zorfix/critical-X.Y.Zbranch offstable. - Cherry-pick or hand-write the minimal fix.
- Open a PR to
stablewith the smallest possible diff. - After merge, release-please will propose a patch-level stable release (e.g.
v3.55.1). - Forward-port the fix to
mainif it isn't already there. Otherwise the next full promotion will reintroduce the bug.
PR #412 ("backport 18 dependency CVE patches from beta") is a worked example of this path (predates the rename; the mechanics are unchanged).
Versioning
PicPeak follows Semantic Versioning with one project-specific convention:
- MAJOR bumps are reserved for breaking schema changes that require operator action on upgrade (e.g. a migration that's not safe to auto-apply, an env-var rename that can't be auto-detected).
- MINOR bumps for new features, additive schema changes, and any change to the public HTTP API surface.
- PATCH bumps for bug fixes and operator-invisible internal changes.
- Pre-release suffix (
-beta.N) for everymain-channel cut; theNcounter resets on each new MINOR or MAJOR target. The suffix kept the historical-betaliteral even after the branch rename — operators were already pinning tov3.x.y-beta.Nand changing the literal would have broken those pins.
release-please derives all of this from conventional commit prefixes (feat:, fix:, BREAKING CHANGE:, etc.) automatically.
Things that don't go through this process
- Documentation-only changes can land on either
stableormaindirectly (no release cut needed); release-please will pick them up on the next regular release. - Test-only changes — same.
- CI / workflow changes — same, but be aware they take effect on the branch they land on, so a CI fix targeting
mainwon't fix a broken stable-channel workflow until the next promotion.
When this doc is wrong
If you find yourself working around something here, update the doc before doing the workaround. The point of a written process is that future-you doesn't have to remember the workaround.