539a83711d
The customer's accept/decline can be toggled for crm_quotes_accept_window_minutes
(default 15) before it locks, and the public page promises exactly that. But the
booking workflow fired on the FIRST accept click and immediately converted the
quote (status -> 'converted'), so a decline within the window was rejected
('Quote cannot be responded to in status converted') — the grace period was dead
on arrival.
recordResponse / adminAcceptQuote now DEFER the workflow emit while the toggle
window is open; the new scheduler sweep finalizeQuoteResponses fires the FINAL
status once response_locked_at passes (idempotent via the new
quotes.workflow_response_emitted_at column, migration 149). A response recorded
with the window already closed (0-min window, or admin decline which locks
immediately) still emits inline. So toggling accept->decline->accept inside the
window converts at most once, for the final state, after the customer's grace
period — and a plain decline never converts.
Trade-off: with the hourly CRM scheduler, the booking flow now starts up to ~1h
after the window locks instead of instantly. Acceptable — the flow gates on admin
review anyway, and the alternative (graph-level wait) wouldn't reach already-
enabled built-ins (admin_toggled_at blocks re-seed).
Adds a finalize sweep test (deferred while open, fires + stamps once locked,
idempotent).