Commit Graph
2 Commits
Author SHA1 Message Date
Luca 9d13880f2b fix(projects): address review — cross-customer guards + email/queue hardening
Resolves the two blockers and the actionable concerns/nits from review.

Blockers (cross-customer leak):
- linkDealToProject: collect the deal's customer + events BEFORE any write,
  then reject a cross-customer link with PROJECT_CUSTOMER_MISMATCH (422) before
  re-pointing events/quotes/contracts or adopting a customer. The editors set
  project_id via quoteService/contractService → linkDealToProject (not
  assignDocument), so the guard lives at that chokepoint. Null-project adoption
  ("first deal wins") preserved as intended.
- assignDocument: boundary guard mirroring customerHoursService, defense-in-depth
  ahead of the cascade.
- Frontend: translated PROJECT_CUSTOMER_MISMATCH (projects.error.customerMismatch,
  de+en) wired into HoursSection + quote/contract editor onError (concern 5).

Concerns:
- 1: processEmailQueue gains an onlyId option; cockpit "send now" scopes the
  flush to the single row so it can't force-retry other dead-lettered emails.
- 2: resendEmail re-stringifies email_data when PG returns a parsed object,
  matching the canonical enqueue — no jsonb double-encode.
- 3: cockpit email feed scoped to the project's own document numbers (event_id
  for gallery mails; email_data doc-number match for CRM mails) instead of the
  recipient string — a shared inbox no longer leaks another customer's mail.
- 4: migration 117 backfill wrapped in a transaction (adds atomicity on SQLite,
  where the runner does not wrap; PG already wraps the whole migration).
- 6: resend/cancel/retry/sendNow now logActivity uniformly (project_email_*),
  adminId threaded from the route.
- 8: validator optional({ values: 'null' }) → optional({ nullable: true }).
- 9: pre-121 list valuation falls back to customer-scoped quotes so the list
  isn't all-zero during the upgrade window.

Nits:
- milestone selection uses Array.at(-1); removed redundant in-loop require in
  emailProcessor; clarifying comments for the list/detail perms split and the
  count-vs-value (0 vs em-dash) convention.
2026-06-13 11:57:32 +02:00
Luca efa47d697d feat(crm): Project Overview phase 1 — projects schema
Data model for the admin-only Project Overview cockpit (Model A — projects
group events; money docs stay per-event and roll up).
- migration 117: projects table (name, customer_account_id nullable, status)
  + events.project_id FK; backfill one auto-project per existing event (1:1
  default, customer = the event's single assignment when unambiguous), admins
  relink freely afterward. 1 project : N events.
- migration 118: customer_hour_entries.project_id (book hours to a project).
- migration 119: email_queue.rendered_html (store actual sent HTML for the
  cockpit's email preview).
All idempotent (hasTable/hasColumn guards), reversible downs. Verified: full
migration boot + backfill on a temp DB.
2026-06-06 03:06:21 +02:00